Metadata-Version: 2.5
Name: the-wip-tally
Version: 0.1.0
Summary: Deterministic AASB 15 construction WIP schedule. Review aid, not a determination.
Project-URL: Homepage, https://github.com/ryanduguid/australian-accounting/tree/main/packages/the-wip-tally
Project-URL: Repository, https://github.com/ryanduguid/australian-accounting/tree/main/packages/the-wip-tally
Project-URL: Issues, https://github.com/ryanduguid/australian-accounting/issues
Author: Ryan Duguid
License-Expression: MIT
License-File: LICENSE
Keywords: aasb-15,accounting,australia,construction,contract-asset,mining,wip
Classifier: Development Status :: 3 - Alpha
Classifier: Environment :: Console
Classifier: Intended Audience :: Financial and Insurance Industry
Classifier: Natural Language :: English
Classifier: Operating System :: OS Independent
Classifier: Programming Language :: Python :: 3
Classifier: Programming Language :: Python :: 3.10
Classifier: Programming Language :: Python :: 3.11
Classifier: Programming Language :: Python :: 3.12
Classifier: Programming Language :: Python :: 3.13
Classifier: Topic :: Office/Business :: Financial :: Accounting
Requires-Python: >=3.10
Provides-Extra: dev
Requires-Dist: build>=1.2; extra == 'dev'
Requires-Dist: mypy>=1.14; extra == 'dev'
Requires-Dist: pytest>=8; extra == 'dev'
Requires-Dist: ruff>=0.11; extra == 'dev'
Description-Content-Type: text/markdown

# The WIP Tally

```
+----------------------------------------------------------------------+
|                            TheWIPTally                               |
+----------------------------------------------------------------------+
|        AASB 15 construction WIP schedule, from a contract CSV        |
+----------------------------------+-----------------------------------+
| DR  what it gives you            | CR  what it needs                 |
+----------------------------------+-----------------------------------+
| cost-to-cost earned revenue      | one row per unit of account       |
| contract asset vs liability      | cost to date, ETC, certified      |
| profit fade and stale ETC flags  | billings, variations, retentions  |
+----------------------------------+-----------------------------------+
```

[![tests](https://github.com/ryanduguid/australian-accounting/actions/workflows/ci-the-wip-tally.yml/badge.svg)](https://github.com/ryanduguid/australian-accounting/actions/workflows/ci-the-wip-tally.yml)
[![PyPI](https://img.shields.io/pypi/v/the-wip-tally.svg?color=5C2D91&labelColor=04001F)](https://pypi.org/project/the-wip-tally/)
[![License: MIT](https://img.shields.io/badge/License-MIT-4F485E.svg?labelColor=04001F)](https://opensource.org/licenses/MIT)
[![Python 3.10+](https://img.shields.io/badge/python-3.10%2B-5C2D91.svg?logo=python&logoColor=white&labelColor=04001F)](https://www.python.org/downloads/)

**Deterministic work-in-progress schedule for Australian construction, civil, mining-services and power-station packages.** Review aid. Not a determination.

**Status: incubating.** It is an evolving review aid, not a substitute for professional judgement.

**Package lifecycle:** published. Install `the-wip-tally` from PyPI.

`hardhat-ledger` already encodes the WIP *workflow*. This engine does the arithmetic that workflow consumes: cost-to-cost progress after AASB 15 para B19 exclusions, constrained variable consideration, per-contract contract assets and contract liabilities, and month-on-month profit fade.

The `australian-accounting` repository contains the maintained source. The
`the-wip-tally` distribution, `wip-tally` command and `wiptally` import package
are the install identifiers.

Release: [`v0.1.0`](https://github.com/ryanduguid/australian-accounting/releases/tag/the-wip-tally/v0.1.0).

Built by Ryan Duguid, a provisional member of Chartered Accountants ANZ. Written independently, in his own time and on his own equipment.

## Not advice

Nothing this engine produces is accounting, tax or legal advice, a journal, a
lodgment, or a conclusion that a contract transfers over time, that a claim is
enforceable, or that a contract is onerous. Those stay with a person. Confirm
the operative AASB 15 compilation at standards.aasb.gov.au before relying on a
paragraph number.

Full boundary statement: [DISCLAIMER.md](https://github.com/ryanduguid/australian-accounting/blob/main/packages/the-wip-tally/DISCLAIMER.md).

## Install

Python 3.10 or later. No runtime dependencies.

```bash
pip install the-wip-tally
```

Download the [fabricated sample contract CSV](https://raw.githubusercontent.com/ryanduguid/australian-accounting/main/packages/the-wip-tally/examples/sample_contracts.csv)
as `sample_contracts.csv` to follow the example below.

## Use

```bash
wip-tally schedule sample_contracts.csv --as-at 2026-08-31
```

```
TheWIPTally: 5 contract(s), as at 2026-08-31

  Contract assets:      221,000.00
  Contract liabilities: 183,333.33
  Revenue to date:      3,087,666.67

  Assets and liabilities are per contract. They are not netted.

  Review flags on 4 contract(s):
    ...
```

The sample is designed to raise review flags. Exit code 2 means a person needs
to look; it is not a crash. Exit code 0 means no review flags, and still
requires practitioner sign-off. Exit code 1 is a data or file error.

Full detail goes to `wip-schedule.csv`. Then:

```bash
wip-tally review-pack wip-schedule.csv --source sample_contracts.csv --as-at 2026-08-31 -o practitioner-review.md
```

The pack binds itself to the source and schedule bytes with SHA-256, lists
every flagged contract, and puts a sign-off checklist on the page. Keep the
CSV beside the pack. The CSV is the row-level evidence.

The reporting date is written on every schedule row, so it is inside the bytes
the pack rebuilds and hashes. Give both commands the same `--as-at`, or the
pack refuses to bind one period's numbers to another period's header.

### Options

| Option | What it does |
| --- | --- |
| `-o, --output` | Where to write the schedule CSV (default `wip-schedule.csv`) or the review pack |
| `--as-at DATE` | Reporting date as `YYYY-MM-DD`, written on every schedule row (default: today) |
| `--mapping-file FILE` | JSON map of canonical field names to your column headings |

## Input columns

Required: `contract_id`, `original_contract_sum`, `costs_incurred`,
`estimated_cost_to_complete`, `certified_billings`. Everything else is optional
but sharpens the answer. Amounts are exclusive of GST.

Every data row must carry one field per header column. Leave an optional field
empty rather than short. A row with the wrong field count is refused with its
row number, because its trailing columns would otherwise shift by one position
and read as absent.

| Field | Meaning |
| --- | --- |
| `contract_id` | One unit of account. Combine contracts under AASB 15 para 17 *before* they reach this file |
| `original_contract_sum` | Signed contract sum |
| `approved_variations` | Priced approved variations |
| `unapproved_variations_estimate` | Expected-value or most-likely claim *before* the constraint |
| `constraint_include_ratio` | Portion highly probable not to reverse, as `0.25` or `25%`. A bare `25` is refused |
| `costs_incurred` | Cost to date, including waste and uninstalled materials |
| `inefficiency_rework_wastage` | Para B19(a) amounts stripped from the progress measure, kept in margin |
| `uninstalled_materials` | Para B19(b) amounts recognised at cost (zero margin) |
| `estimated_cost_to_complete` | Current ETC. An unchanged ETC after material spend is flagged stale |
| `certified_billings` | Amounts certified, exclusive of GST |
| `uncertified_claims` | Claimed but not certified. Never treated as billing or as entitlement |
| `retention_withheld` | Retention on this contract |
| `retention_classification` | `receivable`, `conditional`, or `review` (the default) |
| `committed_outstanding` | Open POs and subcontracts still to invoice |
| `outcome_reasonably_measurable` | `yes` (default) or `no`. `no` applies para 45 recoverable-cost-only revenue |
| `recoverable_costs` | Required in substance when the outcome is not measurable; defaults to progress cost, and is refused above `costs_incurred` |
| `progress_method` | `cost_to_cost` (default), `output`, or `right_to_invoice` |
| `output_percent` | Required for `output`, as `0.40` or `40%` |
| `prior_*` | Prior-period transaction price, EAC, cost, ETC and revenue, for fade and period revenue |
| `gst_rate` | Default `0.10`. Used only to *show* GST on certified billings and retention |
| `assets_used_carrying` | If the job is underwater, flags AASB 137 para 69 (impair first) |

Dates are not required. This is a position schedule, not a cash-flow forecast.

A `--mapping-file` JSON object maps canonical names to your headings. Download
the [mapping example](https://raw.githubusercontent.com/ryanduguid/australian-accounting/main/packages/the-wip-tally/examples/mapping.example.json)
from the maintained source.

## The rules it applies

Paragraph numbers below are from the compilation current when this engine was
written. Confirm the operative compilation at standards.aasb.gov.au before
citing them. The source notes are in
[docs/aasb-15-source-notes-2026-08-25.md](https://github.com/ryanduguid/australian-accounting/blob/main/packages/the-wip-tally/docs/aasb-15-source-notes-2026-08-25.md).

**Transaction price.** Original sum plus approved variations plus the
constrained slice of unapproved estimates. The excluded slice is flagged, not
booked. Uncertified claims are never added to billings.

**Cost-to-cost progress.** `(costs incurred - B19 exclusions) / (EAC - B19
exclusions)`. Wasted cost stays in estimated cost at completion, so it hits
margin, but it does not accelerate percent complete. Uninstalled materials are
recognised at cost (zero margin) and the remainder of the transaction price
follows the stripped ratio.

**Contract asset vs liability.** Revenue to date less certified billings, per
contract. Positive is a contract asset. Negative is a contract liability. The
engine never offsets one contract against another. Retention classification
under paras 105-108 is flagged for the engagement lead; it is not auto-posted
to receivables.

**Profit fade.** Current margin at completion versus prior-period margin, in
percentage points. A movement of 1.00 point or more is a review flag. An ETC
that has not moved after $1,000 or more of additional cost is flagged stale.

**Onerous contracts.** If EAC exceeds transaction price the row is flagged for
AASB 137. This engine does not measure the provision and does not post it.
Where `assets_used_carrying` is supplied it also flags para 69 (impair those
assets before raising a provision).

**GST.** Certified billings and retention are shown grossed-up at `gst_rate` as
a BAS review note. Australian progress claims commonly invoice GST on the full
certified amount, including retention that has not been paid in cash. This is
not a BAS engine.

**Tax.** Do not carry this progress measure into a tax computation. Confirm the
ATO position on long-term construction contracts at ato.gov.au for the year.

## What it does not do

- Decide over-time versus point in time (AASB 15 paras 35-38)
- Combine contracts (para 17)
- Decide whether a variation or claim is legally enforceable
- Measure an onerous-contract provision under AASB 137
- Prepare a Security of Payment payment claim
- Lodge a BAS, compute fuel tax credits, or run TPAR
- Replace `hardhat-ledger`, which still owns the workflow around this file

Use [hardhat-ledger](https://github.com/ryanduguid/hardhat-ledger) for the
review steps. Use this engine for the numbers those steps consume.

## Local file boundary

This is a single-user command-line tool. Its input, mapping and output
arguments designate files the invoking operating-system account has chosen to
read or write; they are not a sandbox. Do not expose the command as a web
endpoint. Outputs must have an explicit `.csv` or `.md` filename and are
written atomically.

## Tests

```bash
pip install -e ".[dev]"
pytest
```

The suite pins the worked examples in `examples/sample_contracts.csv`: a clean
underbilling, B19 wastage with profit fade, a constrained mining-services
claim, uninstalled materials on an underwater power-station civil package, and
para 45 recoverable-cost-only revenue. Test data is synthetic. Never commit
client job-cost data to this repository.

## Disclaimer

This is an educational tool, not tax, legal or financial advice, and using it
creates no professional relationship. Outputs can be wrong, incomplete, stale
or unsuitable for a given set of facts. Check anything material against the
current standards and the entity's facts, and leave sign-off with a registered
practitioner.

MIT licensed.