Metadata-Version: 2.4
Name: dcaf-idaholab
Version: 0.1.0
Summary: Discounted Cashflow Analysis Framework is a financial engineering library for nuclear energy projects.
Project-URL: Homepage, https://github.com/IdahoLabResearch/DCAF
Project-URL: Documentation, https://github.com/IdahoLabResearch/DCAF/tree/main/docs
Project-URL: Repository, https://github.com/IdahoLabResearch/DCAF.git
Project-URL: Issues, https://github.com/IdahoLabResearch/DCAF/issues
Author: Dylan J. McDowell, Jacob A Bryan, Caleb M Sitton, Gabriel J Soto Gonzalez, Nahuel Guaita, Paul W Talbot
Maintainer: Idaho National Laboratory
License-Expression: MIT
License-File: LICENSE
License-File: NOTICE.txt
Keywords: discounted cash flow,extended power uprate,financial engineering,nuclear energy,techno-economic analysis
Classifier: Development Status :: 4 - Beta
Classifier: Intended Audience :: Science/Research
Classifier: Operating System :: OS Independent
Classifier: Programming Language :: Python :: 3
Classifier: Programming Language :: Python :: 3 :: Only
Classifier: Topic :: Office/Business :: Financial
Classifier: Topic :: Scientific/Engineering
Requires-Python: >=3.11
Requires-Dist: python-dateutil>=2.9.0.post0
Requires-Dist: types-python-dateutil>=2.9.0.20260302
Description-Content-Type: text/markdown

# DCAF

The Discounted Cash Flow Analysis Framework is a professional financial engineering
library for nuclear energy project cost and metric calculations, with a focus on
Extended Power Uprate (EPU) projects.

## Installation

Install the `dcaf-idaholab` distribution from PyPI:

```bash
uv add dcaf-idaholab
# or: pip install dcaf-idaholab
```

The Python import package remains `dcaf`:

```python
from dcaf import EnergyProject
```

## Overview

DCAF provides high-fidelity cost modeling and financial analysis tools
specifically designed for nuclear energy projects. The library enables detailed
financial analysis including:

- Net Present Value (NPV), Discounted Cashflow (DCF) and Internal Rate of Return
  (IRR) calculations
- Financing cost modeling with accurate interest calculations
- Tax and incentive analysis
  - Production Tax Credits
  - Investment Tax Credits
  - MACRS and VDB depreciation scheduling
- Pro-forma generation for detailed financial projections
- Comprehensive cost modeling for EPU projects

## Day Count Conventions

Project analyses default to `actual/actual`, which uses real calendar days and
splits annual-rate calculations by calendar year so leap-year days use a 366-day
denominator. Use `actual/365-no-leap` when you intentionally want normalized
365-day project years that exclude Feb. 29 from elapsed-day counts. Use
`actual/365-fixed` when you need actual calendar days divided by 365.

The project-wide default is set with `EnergyProject(day_count_convention=...)`
or `.day_count_convention(...)`, and it flows into NPV, IRR, LCOE, escalation,
construction interest, operating-year proration, and capacity-hour generation.

Bank-loan and bond-style conventions such as `actual/360` and `30/360` are
useful future additions, but they are not implemented yet.