Metadata-Version: 2.4
Name: msproject-mcp
Version: 0.7.0
Summary: Control Microsoft Project via COM automation through the Model Context Protocol
Author-email: Thomas Faria <ti@gplincorporadora.com.br>
License: MIT License
        
        Copyright (c) 2026 Ibrahim Elsahafy
        
        Permission is hereby granted, free of charge, to any person obtaining a copy
        of this software and associated documentation files (the "Software"), to deal
        in the Software without restriction, including without limitation the rights
        to use, copy, modify, merge, publish, distribute, sublicense, and/or sell
        copies of the Software, and to permit persons to whom the Software is
        furnished to do so, subject to the following conditions:
        
        The above copyright notice and this permission notice shall be included in all
        copies or substantial portions of the Software.
        
        THE SOFTWARE IS PROVIDED "AS IS", WITHOUT WARRANTY OF ANY KIND, EXPRESS OR
        IMPLIED, INCLUDING BUT NOT LIMITED TO THE WARRANTIES OF MERCHANTABILITY,
        FITNESS FOR A PARTICULAR PURPOSE AND NONINFRINGEMENT. IN NO EVENT SHALL THE
        AUTHORS OR COPYRIGHT HOLDERS BE LIABLE FOR ANY CLAIM, DAMAGES OR OTHER
        LIABILITY, WHETHER IN AN ACTION OF CONTRACT, TORT OR OTHERWISE, ARISING FROM,
        OUT OF OR IN CONNECTION WITH THE SOFTWARE OR THE USE OR OTHER DEALINGS IN THE
        SOFTWARE.
        
Project-URL: Homepage, https://github.com/devGPL/MS-Procject-MCP
Project-URL: Repository, https://github.com/devGPL/MS-Procject-MCP
Project-URL: Issues, https://github.com/devGPL/MS-Procject-MCP/issues
Keywords: mcp,model-context-protocol,microsoft-project,msproject,com,pywin32,project-management
Classifier: Development Status :: 4 - Beta
Classifier: Environment :: Win32 (MS Windows)
Classifier: Intended Audience :: Developers
Classifier: License :: OSI Approved :: MIT License
Classifier: Operating System :: Microsoft :: Windows
Classifier: Programming Language :: Python :: 3
Classifier: Programming Language :: Python :: 3.10
Classifier: Programming Language :: Python :: 3.11
Classifier: Programming Language :: Python :: 3.12
Classifier: Topic :: Office/Business :: Scheduling
Classifier: Topic :: Software Development :: Libraries :: Python Modules
Requires-Python: >=3.10
Description-Content-Type: text/markdown
License-File: LICENSE
Requires-Dist: mcp<1.20,>=1.16
Requires-Dist: pywin32>=306; sys_platform == "win32"
Requires-Dist: python-dateutil>=2.8
Provides-Extra: fast
Requires-Dist: mpxj>=14; extra == "fast"
Requires-Dist: jpype1>=1.5; extra == "fast"
Dynamic: license-file

# MS Project MCP Server

Controla o Microsoft Project via automação COM através do Model Context Protocol (MCP).

99 ferramentas para ler, editar e analisar cronogramas direto do seu assistente de IA — sem sair do chat.

---

## Requisitos

| Item | Detalhe |
|------|---------|
| SO | **Windows** (a automação COM não existe em macOS/Linux) |
| Microsoft Project | Instalado e **em execução** (testado no MS Project 16.0) |
| Python | 3.10 ou superior |
| Arquitetura | x64 e ARM64, sem diferença de instalação — nenhuma dependência precisa de compilador |

```bash
pip install mcp pywin32 python-dateutil
```

> `python-dateutil` só é necessário para `add_recurring_task`.

---

## Instalação

```bash
git clone https://github.com/devGPL/MS-Procject-MCP
cd MS-Procject-MCP
pip install -e .
```

Isso instala as dependências declaradas (`mcp`, `pywin32` no Windows, `python-dateutil`) e cria o comando `msproject-mcp`. Teste que ele sobe:

```bash
msproject-mcp
```

Ele fica aguardando no stdin — é o transporte do MCP. `Ctrl+C` encerra. Se aparecerem as duas linhas de diagnóstico em stderr, está funcionando.

`python server.py` continua funcionando de forma idêntica, caso prefira não instalar.

Para ligar o caminho rápido de leitura (leia [Dois caminhos de leitura](#dois-caminhos-de-leitura) antes — ele não funciona em Windows ARM64):

```bash
pip install -e ".[fast]"
```

> **Antes de usar qualquer ferramenta**: o MS Project precisa estar aberto com um arquivo carregado. O servidor se conecta a uma instância já em execução; ele não abre o Project sozinho.

> **Por que `pip install -e .` e não `pip install mcp pywin32`**: o erro mais comum de configuração é instalar as dependências num interpretador e apontar o cliente MCP para outro. Com o pacote instalado, o `msproject-mcp` que o cliente executa é o do ambiente que tem as bibliotecas — e some o caminho absoluto do JSON de configuração.

---

## Configuração — Claude

### Claude Desktop

Edite `claude_desktop_config.json`:

- **Windows:** `%APPDATA%\Claude\claude_desktop_config.json`
- **macOS:** `~/Library/Application Support/Claude/claude_desktop_config.json`

```json
{
  "mcpServers": {
    "msproject": {
      "command": "msproject-mcp",
      "args": []
    }
  }
}
```

Reinicie o Claude Desktop. O servidor aparece no ícone de ferramentas (🔨) do chat.

### Claude Code

Via CLI (recomendado — grava a config pra você):

```bash
claude mcp add msproject --scope user -- msproject-mcp
```

Escopos disponíveis:

| Escopo | Onde grava | Quando usar |
|--------|-----------|-------------|
| `user` | Config global do usuário | Disponível em todos os projetos |
| `project` | `.mcp.json` no repositório | Compartilhado com o time via Git |
| `local` | Só a sessão/pasta atual | Testes pontuais |

Conferir o registro:

```bash
claude mcp list
```

Alternativa manual — crie `.mcp.json` na raiz do projeto:

```json
{
  "mcpServers": {
    "msproject": {
      "command": "msproject-mcp",
      "args": []
    }
  }
}
```

---

## Configuração — Codex

### Via CLI

```bash
codex mcp add msproject -- msproject-mcp
```

Conferir:

```bash
codex mcp list
```

### Via arquivo

Edite `~/.codex/config.toml` (no Windows: `%USERPROFILE%\.codex\config.toml`):

```toml
[mcp_servers.msproject]
command = "msproject-mcp"
args = []
```

> **`msproject-mcp` não encontrado**: o comando fica no diretório `Scripts` (Windows) ou `bin` do ambiente onde você rodou `pip install -e .`. Se esse diretório não está no `PATH` do cliente, use o caminho absoluto do executável em `command`, ou instale dentro de um venv e aponte para o `msproject-mcp` dele.

Sem instalar o pacote, aponte para o `server.py` diretamente — aqui as barras invertidas precisam de escape `\\`, ou use string literal com aspas simples:

```toml
[mcp_servers.msproject]
command = "C:\\Python312\\python.exe"
args = ["C:\\caminho\\para\\MS-Procject-MCP\\server.py"]
```

---

## MS Project numa VM (Parallels, VMware, Hyper-V)

Se o Claude roda no macOS e o MS Project numa VM Windows, **não** dá para usar o padrão de SSH que funciona com outros MCPs.

O motivo é específico deste servidor. `GetActiveObject` lê a *Running Object Table* do Windows, que é **por sessão de logon**. Um login SSH cai na sessão 0; o MS Project aberto na área de trabalho está na sessão 1. Da sessão 0 ele é invisível, e a tentativa falha com `MK_E_UNAVAILABLE (0x800401E3)` mesmo com o programa aberto.

Servidores que conversam por porta TCP com o aplicativo alvo atravessam sessão sem problema — este precisa anexar via COM, e COM não atravessa.

A solução é inverter o que cruza a fronteira: em vez do COM atravessar a sessão, o **HTTP atravessa a máquina**.

### Na VM Windows

Instale e rode **a partir da área de trabalho** — um terminal aberto na VM, um atalho, ou a pasta Inicializar. Nunca por SSH, e **nunca como administrador**:

```bash
msproject-mcp --transport streamable-http --host 0.0.0.0 --port 8765
```

Libere a porta no firewall, uma vez só (PowerShell como administrador):

```powershell
New-NetFirewallRule -DisplayName "MS Project MCP" -Direction Inbound -LocalPort 8765 -Protocol TCP -Action Allow
```

### Subir junto com o Windows

Para não depender de abrir um terminal a cada login, crie `C:\msproject-mcp\start-server.cmd`:

```bat
@echo off
title MS Project MCP Server
set LOG=%LOCALAPPDATA%\msproject-mcp.log
echo ===== iniciado em %DATE% %TIME% ===== >> "%LOG%"
"%LOCALAPPDATA%\Programs\Python\Python312-arm64\Scripts\msproject-mcp.exe" --transport streamable-http --host 0.0.0.0 --port 8765 >> "%LOG%" 2>&1
echo ===== encerrado em %DATE% %TIME% (codigo %ERRORLEVEL%) ===== >> "%LOG%"
```

E um `.vbs` na pasta Inicializar (`Win+R` → `shell:startup`) para lançá-lo minimizado:

```vbs
CreateObject("WScript.Shell").Run """C:\msproject-mcp\start-server.cmd""", 7, False
```

A pasta Inicializar roda na sessão interativa e sem elevação, que é exatamente o que o COM exige. Um Agendador de Tarefas configurado com "executar com privilégios mais altos" **quebraria** por causa do nível de integridade.

O log em `%LOCALAPPDATA%\msproject-mcp.log` é onde procurar quando o servidor não sobe — a janela minimizada some sem deixar rastro se o processo morrer.

### No Mac

```bash
claude mcp add --transport http msproject http://10.211.55.5:8765/mcp
```

Troque o IP pelo da sua VM (`ipconfig` no Windows). No Claude Desktop, use `"url": "http://10.211.55.5:8765/mcp"` em vez de `command`/`args`.

> **Não eleve o terminal.** A Running Object Table também é separada por nível de integridade: um servidor iniciado como administrador roda em *High* e não enxerga o MS Project aberto normalmente, em *Medium*. Mesma máquina, mesma sessão, mesmo usuário — e o erro é idêntico ao de "não está rodando". A regra de firewall precisa de admin uma única vez; o servidor, nunca.

> **Segurança**: `--host 0.0.0.0` aceita conexões de qualquer interface e o servidor não tem autenticação própria. Use apenas em rede host-only do Parallels/VMware. Numa rede compartilhada com terceiros, qualquer um que alcance a porta controla o seu MS Project.

---

## Verificando a conexão

Peça ao assistente para rodar `health_check`. A resposta traz a versão do MS Project e o status do arquivo aberto. Se falhar:

| Erro | Causa | Solução |
|------|-------|---------|
| `Could not attach to MS Project` com o MS Project claramente aberto | Servidor iniciado como administrador. A Running Object Table é filtrada por nível de integridade: um processo *High* não enxerga um *Medium* | Suba o servidor num PowerShell **normal**. Rodar como admin piora, não ajuda |
| `MS Project is not running` | Nenhuma instância ativa | Abra o MS Project |
| `No project file is open` | Project aberto sem arquivo | Abra ou crie um `.mpp` |
| Servidor não aparece no cliente | Caminho errado ou JSON/TOML inválido | Confira o caminho absoluto e reinicie o cliente |
| `ModuleNotFoundError: win32com` | `pywin32` ausente no Python usado | Instale no mesmo interpretador que está no `command` |
| `Failed building wheel for cryptography` / `linker link.exe not found` | Versão do `mcp` fora do teto declarado, puxando `cryptography`, que não tem wheel para Windows ARM | `pip install -e .` a partir deste repositório — o teto `mcp<1.20` evita a dependência |

---

## Ferramentas

Organizadas por módulo. Cada arquivo carrega no seu cabeçalho a regra de fronteira que decide o que entra nele.

### Projeto, multiprojeto e intercâmbio (17)
`msp_projects.py` — ciclo de vida do arquivo .mpp, navegação entre projetos abertos, import/export e a sonda de conectividade

`open_project` · `new_project` · `get_project_info` · `set_project_properties` · `save_project` · `save_project_as` · `close_project` · `import_xml` · `export_xml` · `list_projects` · `switch_project` · `cross_project_link` · `undo_last` · `insert_subproject` · `snapshot_to_json` · `health_check` · `snapshot_diff`

### Leitura de tarefas (17)
`msp_tasks_read.py` — consultas, filtros, agregações e exportações — nada aqui escreve no projeto

`get_tasks` · `get_task` · `get_tasks_by_rag` · `get_overdue_tasks` · `get_tasks_by_resource` · `search_tasks` · `get_progress_summary` · `get_wbs_structure` · `filter_tasks` · `group_tasks_by` · `get_milestone_report` · `get_progress_by_wbs` · `export_csv` · `apply_filter` · `get_constraints` · `get_actual_work` · `get_timephased_data`

### Escrita de tarefas (19)
`msp_tasks_write.py` — criação, atualização, exclusão, modo de agendamento e edições em lote

`update_task` · `bulk_update_rag` · `bulk_update_tasks` · `add_task` · `bulk_add_tasks` · `delete_task` · `set_task_mode` · `bulk_set_task_mode` · `set_constraint` · `clear_estimated_flags` · `indent_task` · `set_deadline` · `set_task_active` · `dry_run_bulk_update` · `move_task` · `copy_task_structure` · `bulk_set_deadlines` · `set_task_hyperlink` · `add_recurring_task`

### Dependências (5)
`msp_dependencies.py` — a rede de precedência entre tarefas

`add_predecessor` · `bulk_add_predecessors` · `remove_predecessor` · `get_task_dependencies` · `get_dependency_chain`

### Recursos (11)
`msp_resources.py` — pool, alocações, disponibilidade e tabelas de custo

`get_resources` · `add_resource` · `assign_resource` · `get_resource_workload` · `bulk_assign_resources` · `remove_resource_assignment` · `update_resource` · `delete_resource` · `get_resource_availability` · `get_resource_rate_tables` · `set_resource_rate_table`

### Calendários (10)
`msp_calendars.py` — calendários base, exceções e horas de trabalho

`get_calendars` · `set_calendar_exception` · `set_project_calendar` · `set_task_calendar` · `create_calendar` · `list_calendar_exceptions` · `delete_calendar` · `delete_calendar_exception` · `set_resource_calendar` · `set_working_hours`

### Cronograma (11)
`msp_schedule.py` — o que é calculado sobre a rede de tarefas: caminho crítico, folga, nivelamento, avanço de status

`get_critical_path` · `get_schedule_analysis` · `validate_schedule` · `level_resources` · `find_available_slack` · `calculate_project` · `update_project` · `reschedule_incomplete_work` · `get_critical_path_sequence` · `get_critical_tasks_for_period` · `what_if_delay`

### Linha de base e custo (6)
`msp_baselines_costs.py` — planejado versus realizado: baselines, valor agregado, custo e variação

`save_baseline` · `clear_baseline` · `get_earned_value` · `compare_baselines` · `get_cost_summary` · `get_variance_report`

### Campos personalizados (3)
`msp_customfields.py` — os slots Text/Number/Date/Flag/Duration

`rename_custom_fields` · `update_custom_fields` · `get_custom_field_values`

**99 ferramentas** em 9 módulos.

---

## Dados retornados por tarefa

Toda consulta (`get_task`, `get_tasks`, etc.) devolve 35+ campos por tarefa, entre eles:

| Campo | Descrição |
|-------|-----------|
| `actual_start` / `actual_finish` | Início/término reais |
| `remaining_duration_days` | Trabalho restante |
| `total_slack_days` / `free_slack_days` | Folga total e livre |
| `deadline` | Prazo indicativo |
| `priority` | Prioridade de nivelamento (0–1000) |
| `constraint_type` / `constraint_date` | Restrição de agendamento |
| `manual` | Agendamento manual vs automático |
| `type` | FixedUnits / FixedDuration / FixedWork |
| `hyperlink` / `hyperlink_text` | Hyperlink da tarefa |

---

## Dois caminhos de leitura

Quatorze ferramentas de leitura respondem a partir do **arquivo `.mpp` salvo** quando conseguem, e caem no COM quando não conseguem. Toda resposta diz qual dos dois respondeu, no bloco `source`.

O motivo é medido. Numa agenda real de 8.429 tarefas:

| | |
|---|---|
| Obter um objeto tarefa pelo COM | 2,635 ms |
| Ler uma propriedade dele | 0,240 ms |
| Enumeração como fatia de uma varredura | 83% |
| Piso para tocar todas as tarefas pelo COM | ~20 s |
| Ler as mesmas 8.429 do arquivo (`mpxj`) | ~1,6 s |

Enumerar é o caro; otimizar a leitura de propriedade ataca 17% do problema.

**Quem usa:** `get_tasks` · `get_task` · `search_tasks` · `get_tasks_by_rag` · `get_overdue_tasks` · `get_tasks_by_resource` · `get_progress_summary` · `get_wbs_structure` · `filter_tasks` · `group_tasks_by` · `get_progress_by_wbs` · `get_constraints` · `export_csv` · `get_critical_path` · `get_schedule_analysis` · `find_available_slack`

As demais continuam só no COM porque precisam de campos que o arquivo não entrega por essa via: linha de base (`get_milestone_report`, `get_variance_report`), trabalho (`get_actual_work`), séries timephased, objetos de dependência (`get_critical_path_sequence`, `what_if_delay`) ou a própria janela (`apply_filter`).

**O que custa.** O caminho rápido lê o arquivo salvo, não o aplicativo em execução — e essa é uma questão de correção, não de velocidade:

- Edições feitas no MS Project e ainda não salvas são invisíveis para ele.
- Uma escrita deste servidor que não persistisse ficaria invisível para a leitura seguinte. É por isso que toda ferramenta que muta salva.

A decisão é tomada **a cada chamada**, nunca uma vez na inicialização. Quando o MS Project reporta alterações não salvas, a resposta traz `warning` dizendo de quando é o arquivo que respondeu. Se o caminho rápido levantar exceção, a resposta vem pelo COM com `action_required` — falha silenciosa aqui é como uma mudança que não entrega nada continua parecendo que funciona.

**Onde não funciona:** `jpype` não publica wheel para Windows em ARM, e o `mpxj` roda na JVM (Java 9+). Nessas máquinas o módulo se declara indisponível, tudo cai no COM e o `source` diz o motivo.

---

## Tamanho das respostas

`get_tasks` num cronograma real devolvia **8,07 MB**. Não chega como lentidão — chega como conversa que acaba cedo.

Medido ponta a ponta com 8.243 tarefas, servidor completo:

| resposta | antes | depois |
|---|---|---|
| `get_tasks` | 7,46 MB | 81,5 KB |
| `filter_tasks` | 7,66 MB | 81,7 KB |
| `get_schedule_analysis` | 1,93 MB | 37,4 KB |
| `get_wbs_structure` | 3,51 MB | 43,6 KB |
| definições das 99 tools | 50,7 KB | 37,5 KB |

Três decisões, nesta ordem de efeito:

**Limite de 200 itens por listagem.** É o único corte que muda o resultado: compactar 64% de algo cem vezes maior que a janela ainda deixa algo inconsumível. A resposta traz `count`/`total` completos e um bloco `page` com `returned`, `offset` e como pedir o resto. Duas portas continuam sem teto: `filter_tasks` com `limit=-1`, e `export_csv`, que escreve arquivo em vez de resposta.

**Campos vazios omitidos.** 57% dos valores de um cronograma real são vazios, zero ou `False`. **Chave ausente significa vazio, zero ou falso** — quem lia `task["notes"]` passa a precisar de `task.get("notes", "")`. Duas exceções: os campos que identificam a linha (`unique_id`, `id`, `name`) e os números onde zero é medição (`percent_complete`, `total_slack_days`, `free_slack_days`, `duration_days`, `outline_level`).

**JSON compacto acima de 4 KB.** Abaixo disso continua indentado — resposta pequena é lida por gente.

Nas definições das ferramentas, o `"title"` que o pydantic gera para cada parâmetro (`"title": "Unique Id"` ao lado de `unique_id`) foi removido: 8 KB, ~2,3k tokens, que todo cliente paga em toda sessão antes da primeira chamada. As descrições das 40 maiores foram reescritas para manter enums, formatos, unidades e sentinelas, e largar a prosa.

`get_wbs_structure` passou a limitar em `max_level=3` por padrão, e diz quantas tarefas ficaram abaixo do corte. Passe `0` para a árvore inteira.

---

## Limitações conhecidas

- **Referências COM obsoletas** — com vários projetos abertos, trocar de projeto invalida as referências existentes. Chame `switch_project` antes de operar em outro arquivo.
- **Desfazer** — `undo_last` suporta até 10 operações consecutivas. O undo via COM é menos confiável que o da interface.
- **Bloqueio de arquivo** — só um processo mantém a conexão COM. Não deixe caixas de diálogo do MS Project abertas com o servidor ativo.
- **Fusos horários** — o COM pode devolver datas com timezone; o servidor normaliza via `_to_naive()`.
- **Tarefas recorrentes** — `RecurringTaskInsert` do MS Project só funciona por diálogo. `add_recurring_task` simula a recorrência criando ocorrências individuais sob uma tarefa-resumo. Requer `python-dateutil`.
- **Dados timephased** — `get_timephased_data` fica lento em intervalos longos. Prefira semanas/meses a anos.

---

## Testes

```bash
python tests/test_new_tools.py  # 11 verificações (CRUD básico)
python tests/test_phase2.py     # 10 verificações (recursos, baselines, WBS)
python tests/test_phase3.py     # 15 verificações (campos personalizados, calendários, cronograma)
python tests/test_phase4.py     # 25 verificações (operações avançadas, multiprojeto, filtros)
python tests/test_phase5.py     # 11 verificações (correções, custo/trabalho)
python tests/test_phase6.py     # 63 verificações (timephased, calendários, variação)
python tests/test_phase7.py     # 45 verificações (caminho crítico, what-if)
```

**180 verificações** em 7 suítes. Não são funções `pytest` — cada suíte é um script sequencial com asserts inline. Todas exigem o MS Project em execução: elas criam e fecham projetos temporários.

Duas suítes tratam dos dois caminhos de leitura:

```bash
python tests/test_vistas_paridade.py  # 96 verificações — não precisa de Windows
python tests/test_backend_parity.py   # exige Windows, MS Project e projeto SALVO
```

`test_vistas_paridade.py` cobre também o corte de payload: que o limite vale, que campos vazios não são publicados, que zero permanece, que respostas grandes saem compactas e que nenhum schema publicado carrega `title`. Ela roda cada ferramenta convertida duas vezes sobre um projeto falso — uma forçada pelo COM, outra recebendo a lista já lida — e exige resposta idêntica. Verifica também que o caminho rápido não toca em nenhuma propriedade COM e que uma ferramenta que publica cinco campos não lê trinta e cinco. Ela prova que os dois **corpos** concordam; que o `mpxj` e o Microsoft Project leem o mesmo arquivo do mesmo jeito, só `test_backend_parity.py` prova — e essa nunca rodou, porque a VM de desenvolvimento é ARM64.

Antes de qualquer commit, rode os portões — eles não precisam de Windows nem do MS Project:

```bash
./tools/gates.sh
```

| Portão | O que verifica |
|---|---|
| `check_names.py` | nome carregado sem nada que o defina — pega helper esquecido num import |
| `snap_tools.py` | as 99 ferramentas ainda registradas, comparando por nome contra um baseline |
| `check_unused.py` | import morto e banner de seção sem código embaixo |

O registro de ferramentas é comparado contra `tools/baseline_tools.json`. Se você adicionar ou remover uma ferramenta de propósito, regere-o:

```bash
python3 tools/snap_tools.py . tools/baseline_tools.json
```

---

## Arquitetura

Onze módulos sobre o framework FastMCP. `server.py` não registra ferramenta alguma: importa os nove que registram e roda o servidor.

| Módulo | Ferramentas | Linhas |
|---|---|---|
| `server.py` | — | 112 |
| `msp_core.py` | — | 538 |
| `msp_fast.py` | — | 422 |
| `msp_projects.py` | 17 | 635 |
| `msp_tasks_read.py` | 17 | 869 |
| `msp_tasks_write.py` | 19 | 1007 |
| `msp_dependencies.py` | 5 | 297 |
| `msp_resources.py` | 11 | 605 |
| `msp_calendars.py` | 10 | 485 |
| `msp_schedule.py` | 11 | 996 |
| `msp_baselines_costs.py` | 6 | 388 |
| `msp_customfields.py` | 3 | 168 |

Total: 6522 linhas.

`msp_fast.py` é o outro leitor: analisa o `.mpp` salvo com `mpxj` em vez de percorrer o COM, e `msp_core.VistaCOM` apresenta uma tarefa COM sob os mesmos nomes de campo — é o que deixa o corpo de uma ferramenta ser escrito uma vez e servido pelos dois. Ver [Dois caminhos de leitura](#dois-caminhos-de-leitura).

`msp_core.py` é a fronteira COM — nenhum módulo de ferramenta fala com o Microsoft Project sem passar por ele. Todo `import win32com` está **dentro** de corpo de função, nunca no topo. É por isso que os módulos importam limpo em macOS e Linux sem pywin32, e é o que permite aos portões em `tools/` verificarem o registro de ferramentas sem Windows.

Cada módulo carrega no cabeçalho a regra que decide o que pertence a ele. Alguns casos não são óbvios e estão documentados lá:

- `set_task_calendar` e `set_resource_calendar` moram em `msp_calendars`, não com tarefas ou recursos — o sujeito é o calendário, a tarefa é só o alvo.
- `export_csv` mora em `msp_tasks_read`, não ao lado de `export_xml`, porque chama `filter_tasks` e essa aresta precisa ficar dentro de um módulo.
- As tabelas de custo ficam em `msp_resources`, não com relatórios de custo: elas escrevem em `r.CostRateTables`, ou seja, editam o recurso.

### Requer Windows de verdade

Nove ferramentas dirigem a janela do MS Project em vez do modelo de objetos, usando `SelectRow` com `EditCut`/`EditCopy`/`EditPaste` ou `OutlineIndent`/`OutlineOutdent`. Elas dependem de estado de seleção dentro do aplicativo, que nenhum fake reproduz — um teste offline passaria sem fazer nada:

`add_recurring_task` · `copy_task_structure` · `delete_task` · `indent_task` · `move_task` · `undo_last` · `insert_subproject` · `apply_filter` · `set_project_calendar`

---

## Contribuindo

Veja [CONTRIBUTING.md](CONTRIBUTING.md) para setup, convenções e como enviar mudanças.

## Licença

MIT — veja [LICENSE](LICENSE).