# Unit prices are expressed in €/...
UnitPrice

# Clean-up
pumping           2.77   #m3
disposal          36.69  #m3
cleaning          2.86   #m2
dehumidification  2.28   #m3

# Removal
flooringsysremoval    2.97  #m2
pavementremoval       7.74  #m2 (average between ceramic and parquet)
baseboardremoval      0.80  #m
plasterboardremoval   7.94  #m2
extplasterremoval     11.34 #m2
intplasterremoval     11.34 #m2
doorsremoval          21.89 #m2
windowsremoval        23.56 #m2 
boilerremoval         0.32  #m2 

# Non-structural
flooringsysreplace   25.00 #m2
plasterboardreplace  39.43 #m2

# Structural
soilconsolidation   313.20  #m3
localrepair         46.51   #m2
pillarretrofitting  222.44  #m2

# Finishing
extplasterreplace  27.90   #m2
intplasterreplace  25.76   #m2
extpainting        18.87   #m2
intpainting        15.85   #m2
pavementreplace    64.63   #m2 (average between ceramic and parquet)
baseboardreplace   4.43    #m  (average between ceramic and parquet)

# Windows and doors
doorsreplace    145.88  #m2
windowsreplace  364.64  #m2

# Building systems
boilerreplace             18.09 #m2
radiatorpaint             39.89 #n
electricalsystreplace     41.29 #m2
plumbingsystreplace       29.82 #m2