← Dashboard Multiple runs →
Operator on duty · from the Ops Log
M. Jones
SRO · Shift 08:00–16:00
Session: 2h 14m
From the Ops Log watch relief · 08:02
Active

Run #5401

Experimenter
Adrian Nakamura
Yb/Lu activation · RSR · RTO-2026-07
Port kiosk: public screen

Irradiation in Progress

Run #5401 — Linked from Ops Log ✓
65%
Complete
Elapsed: 68m
Remaining: ~22–52m
On track

Yb/Lu activation — RSR

Target window: 90–120 min @ 100 kW
68 min
65% of schedule · on track ✓
Inserted: 08:12:00 · Est. Removal: 09:42–10:12

Reactor Power

100.2 kW
Setpoint: 100 kW ± 1%
Δ +0.2% ✓

Thermal Flux — RSR

1.84×10¹³
Normal: 1.8–2.2×10¹³ n/cm²·s
Δ −8.7%

Position Temperature

41.2 °C
Normal: 25–45 °C
Δ +2.0% ✓
? Notice Xe-135 +10% above the digital-twin prediction. Not an alarm: acknowledge when convenient. SRO notified.
Beam Port · Kiosk Connected — Adrian Nakamura
GO GIVEN VERBALLY — 08:05:22
Verbal go given by the operator; experimenter marked ready
Insertion signed once by the RO in the Ops Log · 5401-017 · 08:12:00