Corporate finance

Capital budgeting

Project NPV, IRR, MIRR, fractional payback, profitability index and equivalent annual annuity.

Model id
corporate.capital_budgeting, version 2
Domain
Corporate finance
Evidence
standard
Cost class
light: A short numerical method; a hosted run may take up to 10 seconds.

Formula

NPV=∑t=0nCt/(1+r)tNPV=\sum_{t=0}^n C_t/(1+r)^tMIRR=(FV(C+,rR)/[−PV(C−,rF)])1/n−1MIRR=(FV(C^+,r_R)/[-PV(C^-,r_F)])^{1/n}-1PI=PV(C+)/[−PV(C−)]PI=PV(C^+)/[-PV(C^-)]EAA=NPV/a(r,n)EAA=NPV/a(r,n)

Where

NPVNPV
Net present value npv
CtC_t
The cash flow at time t; negative when paid out cash_flows
rr
Discount rate per period rate
nn
Number of periods after time 0
MIRRMIRR
Modified internal rate of return mirr
C+C^+
The positive cash flows
C−C^-
The negative cash flows
rRr_R
Reinvestment rate for the positive flows reinvestment_rate
rFr_F
Financing rate for the negative flows finance_rate
FVFV
Future value at period n
PVPV
Present value at time 0
PIPI
Profitability index profitability_index
EAAEAA
Equivalent annual annuity equivalent_annual_annuity
a(r,n)a(r,n)
The annuity factor: the present value of 1 a period for n periods at rate r

Each symbol's field is named beside it; the inputs and outputs, with their units and bounds, are under Variables, and the citations give each formula's source.

Variables

Rates, returns and yields are decimals: 0.05 is five percent. Bounds in brackets include their end; in parentheses they exclude it.

Inputs

Inputs
NameDescription
Cash flowscash_flowsmoney (array) · length min 2, max 1201; each [-1e+12, 1e+12]Signed project cash flows at t=0, 1, ...; negative means paid out
Rateraterate · [-0.99, 1]Discount rate per period
Finance ratefinance_raterate · [-0.99, 1]MIRR financing rate per period for negative flows
Reinvestment ratereinvestment_raterate · [-0.99, 1]MIRR reinvestment rate per period for positive flows

Outputs

Outputs
NameDescription
NPVnpvmoney · [-1e+15, 1e+15]NPV including the undiscounted t=0 flow
IRRirrrate · [-0.99, 10]Smallest IRR in [-0.99, 10], or null with warning
MIRRmirrrate · [-0.99, 10]Modified IRR per period, or null with warning
Paybackpaybackperiods · [0, 1200]First nominal cumulative recovery time, fractional periods; null if never reached
Discounted paybackdiscounted_paybackperiods · [0, 1200]First discounted cumulative recovery time, fractional periods
Profitability indexprofitability_indexratio · [0, 1e+06]PV of positive flows / absolute PV of negative flows
Equivalent annual annuityequivalent_annual_annuitymoney · [-1e+15, 1e+15]NPV / annuity factor over the project's periods; annual only when periods are years

Calculator

Run the model on your own inputs, starting from its example. Rates are decimals: 0.05 is five percent. The run goes to the pyeconomics API on this site: your values travel only in the request, and nothing is stored.

Loading the calculator…

Worked example

Example two_year_project. Inputs:

{
  "cash_flows": [-100, 60, 60],
  "finance_rate": 0.1,
  "rate": 0.1,
  "reinvestment_rate": 0.1
}

Outputs:

{
  "discounted_payback": 1.916666666666667,
  "equivalent_annual_annuity": 2.3809523809523747,
  "irr": 0.13066238629180701,
  "mirr": 0.12249721603218215,
  "npv": 4.132231404958667,
  "payback": 1.6666666666666665,
  "profitability_index": 1.0413223140495866
}

Assumptions

  • Signed cash flows are equally spaced, first at time zero. Rates are decimals per period.
  • Payback interpolates the first cumulative recovery; positive t=0 flow gives payback zero.
  • PI discounts all inflows and all outflows, not just the initial outlay.

Limitations

  • NPV outside +/-1e15 raises DomainError. IRR follows core's sign-change scan and smallest-root policy, which can miss tangent or closely spaced roots.
  • Undefined or unrepresentable partial outputs are null with warnings: no IRR, missing MIRR sign, no payback, zero PI denominator, or overflow. MIRR is limited to [-0.99, 10].
  • Discounted payback is not shorter for conventional cash flows at nonnegative discount rates; the MIRR interval identity assumes a single initial outlay and subsequent inflows.

Evidence

Status: standard. Textbook consensus, such as bond duration or the CAPM formula.

Every model declares one status: standard (textbook consensus), practitioner (a widely used convention), contested (under active debate), rejected (failed out of sample) or historical (a superseded methodology).

Syllabus

The 2027 CFA® Program's topic areas this model relates to, as factual tags. Each links to CFA Institute's page for its level; pyeconomics holds none of the curriculum's text.

Citations

  1. Microsoft. MIRR function. https://support.microsoft.com/en-us/excel/functions/mirr-function (Syntax and five-year example)
  2. Kellison, S. G. (2009). The Theory of Interest, 3rd ed. McGraw-Hill. https://www.mheducation.com/highered/product/theory-interest-kellison.html (Yield rates and investment appraisal). ISBN 9780073382449

Changelog

  • Version 1: First version.
  • Version 2: Recognize IRR roots at inclusive bracket endpoints (#85).

Use it elsewhere

Documentation
The model's reference page
REST API
GET or POST /v1/models/corporate.capital_budgeting/run
MCP tool
corporate_capital_budgeting, or run_model with the model's id; both give the same result. Connect an assistant
Command line
pyeconomics models run corporate.capital_budgeting --help

The worked example, from Python and from the command line:

Python
import pyeconomics

inputs = {
    "cash_flows": [-100, 60, 60],
    "finance_rate": 0.1,
    "rate": 0.1,
    "reinvestment_rate": 0.1,
}
result = pyeconomics.run("corporate.capital_budgeting", inputs)
print(result.to_json())
Command line
pyeconomics models run corporate.capital_budgeting --inputs - <<'JSON'
{
  "cash_flows": [-100, 60, 60],
  "finance_rate": 0.1,
  "rate": 0.1,
  "reinvestment_rate": 0.1
}
JSON