← Back to queue
Marta Okafor 555-555-5555
Cerlum Labs
07/06/2026
VIEW OPER-2

Activation of sodium acetate and sodium carbonate for Na-24 Production

Mode: Auto
Power: 450 kW
Duration and Frequency: 5 x 8 hr days
In-Core Facilities:
Ex-Core Facilities:

Description:

Triskem and DGA resins intended for use in Ac-225 separations will be irradiated to determine material compositions and separation effects of surrogate materials, such as Lanthanum or Barium in solution. These measurements may occur periodically as needed.

Additional Instructions & Containment Requirements:

For 3L, devices will typically be wrapped in household aluminum foil to protect the delicate contact pins along the edges of the devices and to facilitate loading/unloading from the 3L. Multiple Devices may be irradiated at the same time. For PNT, devices will be in 2-dram poly vials.

Material Evaluation

IC chips similar to flash memory chips

Composition: Solid
Hazards:
  • β irradiation
  • γ irradiation
Major Isotopes: Au-198
Trace Isotopes: Trace Activation Products
Request Number
  • [3El Authorization] Tri-Element Irradiation Facility (Apr 2001)
  • [ePnt/Pnt Auth] Pneumatic Transfer System Mod (Aug 1998)
Category
Personnel Required: