ikea research videosSignals
Grey until the first report exists, with the status under the project name. Plan:
docs/design-signals-lens-readiness.md. Nothing here is built.
The page as it is today once the report has landed.
| Case | Signals lens | Sidebar status | Why |
|---|---|---|---|
| Study with no stored report with a card (including an empty one), cloud model, build running or about to start | grey | Picking up Signals… | The case this plan is for. |
| Study with an older stored report (format changed), rebuild running | lit | none | The old report keeps being served; nothing to hide. |
| Study with a current report; a codebook apply or new interviews rebuild it | lit | none | Same: last good report stays. |
| No cloud model (provider is local, or no key) | lit | none | No report will ever be built; grey for ever would lie. |
| Build failed, or a card could not be written | lit | none | The flag clears when the attempt ends; the next open retries. No retry control. |
| A run is in flight (first analysis) | grey (as shipped) | Analysing… | Signals is already withheld until the join barrier. |
| Second window on the same project | grey in both | per window | Each window's own row shows the status. |
| Text | Source |
|---|---|
| Signals, Sessions, Project, … | shipped lens names |
| Analysing · 4 of 8 · ~1 min left | shipped ladder, desktop.chrome.pipeline.analysing and stage verbs |
| Picking up Signals… | NEW, owner-written. One key, 21 locales, to be approved. In-family alternatives: "Writing Signals…", "Building Signals…" (stage verbs name the work). Row budget about 22 characters: German and Finnish renderings would truncate. |
| Partial completion | shipped |