Updated top-down read of the Grid office. Northeast is Launch Control for merge and
ship work; southwest is recovery for failed, timeout, and blocked states.
Back Wall
The Kanban mirror becomes a taller continuous north wall, with TODO in the War Room
and the Launch Control north wall dedicated to Done issues.
Launch
The northeast corner owns merge and ship work, replacing the stale boardroom/intake
interpretation.
Recovery
Failed, timeout, and blocked agents move southwest instead of mixing with healthy idle
agents.
Furniture
Entry uses the selected light-curtain turnstiles, while QA uses the selected compiler
reactor lab language.