  Page 1                                    Mon May 18 15:10:39 2026

  ******************************************************************
  *                           E P A N E T                          *
  *                   Hydraulic and Water Quality                  *
  *                   Analysis for Pipe Networks                   *
  *                          Version 2.3.05                        *
  ******************************************************************
  
  Analysis begun Mon May 18 15:10:39 2026

   
  Hydraulic Status:
  -----------------------------------------------------------------------
     0:00:00: Balanced after 7 trials
     0:00:00: Reservoir 9 is emptying
     0:00:00: Tank 2 is filling at 120.00 ft
   
     1:00:00: Balanced after 2 trials
   
     2:00:00: Balanced after 3 trials
   
     3:00:00: Balanced after 2 trials
   
     4:00:00: Balanced after 2 trials
   
     5:00:00: Balanced after 2 trials
   
     6:00:00: Balanced after 2 trials
     6:00:00: Tank 2 is emptying at 128.19 ft
   
     7:00:00: Balanced after 2 trials
   
     8:00:00: Balanced after 2 trials
     8:00:00: Tank 2 is filling at 127.35 ft
   
     9:00:00: Balanced after 2 trials
   
    10:00:00: Balanced after 2 trials
   
    11:00:00: Balanced after 2 trials
   
    12:00:00: Balanced after 2 trials
   
    13:00:00: Balanced after 2 trials
   
    14:00:00: Balanced after 3 trials
   
    15:00:00: Balanced after 2 trials
   
    15:53:58: Pump 9 changed by Tank 2 control
    15:53:58: Balanced after 4 trials
    15:53:58: Reservoir 9 is closed
    15:53:58: Tank 2 is emptying at 140.00 ft
    15:53:58: Pump 9 changed from open to closed
   
    16:00:00: Balanced after 2 trials
   
    17:00:00: Balanced after 2 trials
   
    18:00:00: Balanced after 2 trials
   
    19:00:00: Balanced after 2 trials
   
    20:00:00: Balanced after 2 trials
   
    21:00:00: Balanced after 2 trials
   
    22:00:00: Balanced after 2 trials
   
    23:00:00: Balanced after 2 trials
   
    24:00:00: Balanced after 2 trials
   
  Hydraulic Flow Balance (gpm)
  ================================
  Total Inflow:          1212.048
  Consumer Demand:       1100.000
  Demand Deficit:           0.000
  Emitter Flow:             0.000
  Leakage Flow:           193.036
  Total Outflow:         1293.036
  Storage Flow:           -80.989
  Flow Ratio:               1.000
  ================================