Metadata-Version: 2.4
Name: xlsx-gantt
Version: 0.4.1
Summary: Editable, presentation-ready Gantt charts as native Excel (.xlsx) files from Python or JSON, with a CLI
Author: trondegil
License: MIT
Project-URL: Homepage, https://github.com/trondegil/xlsx-gantt
Project-URL: Repository, https://github.com/trondegil/xlsx-gantt
Project-URL: Bug Tracker, https://github.com/trondegil/xlsx-gantt/issues
Project-URL: Changelog, https://github.com/trondegil/xlsx-gantt/blob/master/CHANGELOG.md
Project-URL: Examples, https://github.com/trondegil/xlsx-gantt/tree/master/examples
Keywords: gantt,gantt-chart,excel,xlsx,openpyxl,chart,cli,json,project-management,project-planning,roadmap,timeline
Classifier: Development Status :: 4 - Beta
Classifier: Intended Audience :: Developers
Classifier: License :: OSI Approved :: MIT License
Classifier: Programming Language :: Python :: 3
Classifier: Programming Language :: Python :: 3.10
Classifier: Programming Language :: Python :: 3.11
Classifier: Programming Language :: Python :: 3.12
Classifier: Programming Language :: Python :: 3.13
Classifier: Topic :: Office/Business :: Scheduling
Classifier: Topic :: Software Development :: Libraries :: Python Modules
Classifier: Typing :: Typed
Requires-Python: >=3.10
Description-Content-Type: text/markdown
License-File: LICENSE
Requires-Dist: openpyxl>=3.1.0
Requires-Dist: Pillow>=10.0.0
Provides-Extra: logo
Requires-Dist: Pillow>=10.0.0; extra == "logo"
Provides-Extra: dev
Requires-Dist: pytest>=7.0; extra == "dev"
Requires-Dist: ruff>=0.4; extra == "dev"
Requires-Dist: mypy>=1.10; extra == "dev"
Dynamic: license-file

<p align="center">
  <picture>
    <source media="(prefers-color-scheme: dark)" srcset="https://raw.githubusercontent.com/trondegil/xlsx-gantt/master/assets/logo-dark.png"/>
    <img src="https://raw.githubusercontent.com/trondegil/xlsx-gantt/master/assets/logo.png" alt="xlsx-gantt" width="300"/>
  </picture>
</p>

<p align="center">
  <a href="https://pypi.org/project/xlsx-gantt/"><img src="https://img.shields.io/pypi/v/xlsx-gantt?color=blue" alt="PyPI version"/></a>
  <a href="https://www.python.org/downloads/"><img src="https://img.shields.io/badge/python-3.10%2B-blue?logo=python&logoColor=white" alt="Python 3.10+"/></a>
  <a href="https://github.com/trondegil/xlsx-gantt/blob/master/LICENSE"><img src="https://img.shields.io/badge/license-MIT-green" alt="MIT License"/></a>
  <a href="https://pypi.org/project/openpyxl/"><img src="https://img.shields.io/badge/openpyxl-%E2%89%A53.1-informational?logo=microsoft-excel&logoColor=white" alt="openpyxl ≥ 3.1"/></a>
  <a href="https://github.com/trondegil/xlsx-gantt"><img src="https://img.shields.io/badge/github-trondegil%2Fxlsx--gantt-181717?logo=github&logoColor=white" alt="GitHub repository"/></a>
</p>

<p align="center">
  Turn Python data into polished, presentation-ready Gantt charts — no Excel required, no GUI needed.<br/>
  Built on <a href="https://openpyxl.readthedocs.io/">openpyxl</a>. Zero heavy dependencies.
</p>

<p align="center">
  <img src="https://raw.githubusercontent.com/trondegil/xlsx-gantt/master/assets/hero.png" alt="xlsx-gantt chart rendered with the midnight theme" width="100%"/>
</p>

---

## Contents

**Getting started:** [Features](#features) · [Installation](#installation) · [Quick Start](#quick-start) · [Command-Line Usage](#command-line-usage) · [AI-Assisted Planning](#ai-assisted-planning) · [Themes](#themes) · [Data Structure](#data-structure)

**Going further:** [Advanced Usage](#advanced-usage) · [Development](#development) · [Requirements](#requirements) · [Contributing](#contributing) · [License](#license)

---

## Features

- **Polished charts out of the box** — pick one of eight ready-made colour themes, or generate a matching palette from your brand colour
- **No Excel needed to create them** — charts are plain `.xlsx` files anyone can open, filter, and edit in Excel
- **Simple to use** — describe your project as sections and tasks, get a presentation-ready chart; even directly from the command line: `xlsx-gantt chart.json -o gantt.xlsx`
- **Shows what matters** — progress bars per task, milestones, who's responsible for what, and automatic time-estimate totals
- **Your language, your logo** — day and week labels are fully configurable, and your logo can sit in the chart header
- **A natural fit for AI-assisted planning** — the whole plan is plain dicts or a JSON file, so an LLM or coding agent can draft it, revise it, and regenerate the chart in one step; describe the project in prose, let the model produce the JSON, and run `xlsx-gantt plan.json -o gantt.xlsx` ([example](#ai-assisted-planning))
- **Lightweight** — just [openpyxl](https://openpyxl.readthedocs.io/) and [Pillow](https://pypi.org/project/Pillow/); no pandas, no matplotlib, no Java bridge

---

## Installation

```bash
pip install xlsx-gantt
```

This includes everything — all logo image formats (PNG, JPEG, BMP, GIF, TIFF)
work out of the box.

---

## Quick Start

Describe the project plan in a JSON file, say `chart.json`. Dates are ISO
strings (`YYYY-MM-DD`):

```json
{
  "project_name": "Website Redesign",
  "start_date": "2026-03-02",
  "end_date": "2026-04-12",
  "resource_names": ["Alice", "Bob"],
  "sections": [
    {
      "name": "Design",
      "tasks": [
        {
          "name": "Research",
          "time_estimate": 3,
          "progress": 80,
          "ranges": [
            {"start": "2026-03-02", "end": "2026-03-06", "color": "0070C0"}
          ],
          "annotations": {"Alice": "R", "Bob": "S"}
        }
      ]
    }
  ]
}
```

Turn it into a chart from the command line, with no Python code:

```bash
xlsx-gantt chart.json -o gantt.xlsx --theme ocean
```

…or load the same file from Python:

```python
from xlsx_gantt import GanttChart, GanttTheme

chart = GanttChart.from_json("chart.json", style=GanttTheme.get("ocean"))
chart.generate_excel("gantt.xlsx")
```

### From Python data

You can also build the plan in Python as plain dicts. The JSON file above uses
the same structure, with `datetime` objects in place of the date strings:

```python
from datetime import datetime
from xlsx_gantt import GanttChart, GanttTheme

sections = [
    {
        "name": "Design",
        "tasks": [
            {
                "name": "Requirements gathering",
                "time_estimate": 3,
                "progress": 100,
                "ranges": [
                    {"start": datetime(2026, 1, 5), "end": datetime(2026, 1, 9), "color": "0070C0"},
                ],
                "annotations": {"Alice": "R", "Bob": "S"},
            },
            {
                "name": "Architecture review",
                "time_estimate": 2,
                "progress": 80,
                "ranges": [
                    {"start": datetime(2026, 1, 12), "end": datetime(2026, 1, 14), "color": "0070C0"},
                ],
                "annotations": {"Alice": "R", "Bob": "R"},
            },
        ],
    },
    {
        "name": "Development",
        "tasks": [
            {
                "name": "Backend",
                "time_estimate": 10,
                "progress": 50,
                "ranges": [
                    {"start": datetime(2026, 1, 19), "end": datetime(2026, 2, 6), "color": "00B050"},
                ],
                "annotations": {"Alice": "S", "Bob": "R"},
            },
            {
                "name": "Frontend",
                "time_estimate": 8,
                "progress": 20,
                "ranges": [
                    {"start": datetime(2026, 1, 26), "end": datetime(2026, 2, 13), "color": "00B050"},
                ],
                "annotations": {"Alice": "R", "Bob": "S"},
            },
        ],
    },
    {
        "name": "Milestones",
        "tasks": [
            {
                "name": "Beta release",
                "time_estimate": None,
                "progress": None,
                "ranges": [
                    {"start": datetime(2026, 2, 9), "end": datetime(2026, 2, 9), "color": "FF0000"},
                ],
            },
        ],
    },
]

style = GanttTheme.get("ocean")

chart = GanttChart(
    sections=sections,
    start_date=datetime(2026, 1, 5),    # Monday
    end_date=datetime(2026, 2, 15),     # Sunday
    project_name="My Project",
    resource_names=["Alice", "Bob"],
    style=style,
    logo_path="logo.png",               # optional
)

# Save to disk
chart.generate_excel("gantt_chart.xlsx")

# — or — get raw bytes (no file written)
xlsx_bytes = chart.generate_excel_bytes()
print("Done!")
```

---

## Command-Line Usage

Installing the package also installs an `xlsx-gantt` command that builds a
chart from a JSON file — no Python required:

```bash
xlsx-gantt chart.json -o gantt.xlsx [--theme ocean | --color 2E86C1] [--logo logo.png] [--week-start sunday]
```

The input is a JSON file like the one in the [Quick Start](#quick-start).

| Option | What it does |
|--------|--------------|
| `-o`, `--output` | Output `.xlsx` path (default `gantt.xlsx`) |
| `--theme NAME` | One of the [built-in themes](#themes) |
| `--color RRGGBB` | Build a theme from your own colour, like `GanttTheme.from_color()`; can't be combined with `--theme` |
| `--logo PATH` | Logo image for the top-left corner (PNG, JPEG, BMP, GIF, TIFF) |
| `--week-start DAY` | First day of the week for the week bands (default `monday`) |

Bar colours are set per range in the JSON (`"color": "RRGGBB"`); bars
without one use the theme's bar colour. Invalid input is reported on stderr
with exit code 1.

The CLI is a thin wrapper around `GanttChart.from_json()`, so the same JSON
file can be loaded from Python too.

---

## AI-Assisted Planning

The plan is plain JSON, so an AI assistant can write it for you. Describe the
project in your own words, save the reply as `plan.json`, and run the CLI.

**The prompt** (works in any chat assistant or coding agent):

```text
Create a project plan as JSON for the xlsx-gantt tool. Use this structure:

{"project_name": str, "start_date": "YYYY-MM-DD", "end_date": "YYYY-MM-DD",
 "resource_names": [str],
 "sections": [{"name": str, "tasks": [{
   "name": str, "time_estimate": working days or null, "progress": 0-100 or null,
   "ranges": [{"start": "YYYY-MM-DD", "end": "YYYY-MM-DD", "color": "RRGGBB"}],
   "annotations": {resource name: "R" (responsible) or "S" (support)}}]}]}

Dates are inclusive. A range where start equals end is a milestone; give
milestones null estimate and progress. Use one colour per section, and start
and end tasks on weekdays. Reply with the JSON only.

The project: we're building online ordering for a small bakery chain. The
team is Maya (design), Leo (development) and Priya (marketing). We started
Monday 13 April 2026 and go live Friday 22 May 2026. Cover discovery,
design, build, testing and launch, with milestones for design sign-off and
go-live. We're two weeks in: discovery and wireframes are done, and visual
design is about half finished.
```

**The result:** Claude replied with
[this plan](https://github.com/trondegil/xlsx-gantt/blob/master/examples/bakery-plan.json).
One command turns it into a chart, here with the bakery's
[logo](https://github.com/trondegil/xlsx-gantt/blob/master/examples/bakery-logo.png)
and brand colour:

```bash
xlsx-gantt plan.json -o bakery.xlsx --color A0522D --logo bakery-logo.png
```

<p align="center">
  <img src="https://raw.githubusercontent.com/trondegil/xlsx-gantt/master/assets/ai-planning-example.png" alt="Gantt chart for the bakery online-ordering project in the bakery's brown brand colour, with its kringle logo in the corner" width="100%"/>
</p>

To change the plan, keep the conversation going ("move user testing a week
later and add a security review"), save the new JSON, and run the command
again. Coding agents such as Claude Code can edit `plan.json` and run the CLI
themselves.

The plan, the logo and the finished workbook
([`bakery-plan.xlsx`](https://github.com/trondegil/xlsx-gantt/raw/master/examples/bakery-plan.xlsx))
are all in [`examples/`](https://github.com/trondegil/xlsx-gantt/tree/master/examples).
From a clone you can rebuild the workbook yourself:

```bash
xlsx-gantt examples/bakery-plan.json -o bakery-plan.xlsx --color A0522D --logo examples/bakery-logo.png
```

---

## Themes

Eight built-in themes are available:

| Name | Description | Base colour |
|------|-------------|-------------|
| `amber` | Warm corporate orange | `FFC000` |
| `ocean` | Deep professional blue | `1A5276` |
| `forest` | Environmental green | `1E8449` |
| `crimson` | Bold, high-impact red | `922B21` |
| `slate` | Minimal neutral gray | `5D6D7E` |
| `royal_purple` | Original default palette | `7030A0` |
| `midnight` | Modern near-black | `1B2631` |
| `teal` | Fresh blue-green | `148F77` |

The same chart in every theme, in the order listed above:

<p align="center">
  <img src="https://raw.githubusercontent.com/trondegil/xlsx-gantt/master/assets/themes/gallery.png" alt="All eight built-in xlsx-gantt themes" width="100%"/>
</p>

```python
from xlsx_gantt import GanttTheme

# By static method
style = GanttTheme.ocean()

# By name (case-insensitive; spaces and hyphens treated as underscores)
style = GanttTheme.get("royal_purple")

# Generated from any base hex colour
style = GanttTheme.from_color("#2E86C1")

# List all available theme names
print(GanttTheme.list_themes())
```

---

## Data Structure

### Sections (dict form)

```python
{
    "name": str,       # section label (merged across all its task rows in column A)
    "tasks": [ ... ]   # list of task dicts (see below)
}
```

### Tasks (dict form)

```python
{
    "name": str,                      # task label
    "time_estimate": float | None,    # hours / days / any unit; summed in the Total row
    "progress": float | None,         # 0–100 %; rendered as a solid DataBar
    "ranges": [                       # one or more coloured bars on the timeline
        {
            "start": datetime,        # inclusive start date
            "end":   datetime,        # inclusive end date (start == end → milestone)
            "color": "RRGGBB",        # 6-digit hex, no '#'; falls back to theme bar colour
        },
        ...
    ],
    "annotations": {                  # optional resource role markers
        "Alice": "R",                 # R = Responsible
        "Bob":   "S",                 # S = Support
    },
}
```

> **Note:** `time_estimate`, `progress`, `ranges`, and `annotations` are all optional.
> Omitting them or passing `None` is handled gracefully.

---

# Advanced Usage

Everything below is optional — the sections above cover the common cases.

## Typed Dataclass API

Instead of plain dicts you can use the typed `Section`, `Task`, and `DateRange`
dataclasses.  Both forms are fully interchangeable and may be freely mixed in the
same `sections` list.

```python
from datetime import datetime
from xlsx_gantt import GanttChart, GanttTheme, Section, Task, DateRange

sections = [
    Section(
        name="Design",
        tasks=[
            Task(
                name="Requirements gathering",
                time_estimate=3,
                progress=100,
                ranges=[
                    DateRange(
                        start=datetime(2026, 1, 5),
                        end=datetime(2026, 1, 9),
                        color="0070C0",
                    )
                ],
                annotations={"Alice": "R", "Bob": "S"},
            ),
        ],
    ),
]

chart = GanttChart(
    sections=sections,
    start_date=datetime(2026, 1, 5),
    end_date=datetime(2026, 2, 15),
    project_name="My Project",
    resource_names=["Alice", "Bob"],
    style=GanttTheme.get("ocean"),
)
chart.generate_excel("gantt_chart.xlsx")
```

### Mixing dicts and dataclasses

```python
from xlsx_gantt import Section, Task

# Dict section alongside dataclass section — both work
sections = [
    {"name": "Phase 1", "tasks": [{"name": "Kickoff", "progress": 100}]},
    Section(name="Phase 2", tasks=[Task(name="Development", time_estimate=10)]),
]
```

### to_dict / from_dict

Each dataclass provides `to_dict()` (serialize back to the dict API) and
`from_dict()` (construct from a raw dict, returning `None` for invalid input):

```python
from xlsx_gantt import Section, Task, DateRange
from datetime import datetime

dr = DateRange(start=datetime(2026, 1, 5), end=datetime(2026, 1, 9), color="0070C0")
print(dr.to_dict())
# {'start': datetime(2026, 1, 5, 0, 0), 'end': datetime(2026, 1, 9, 0, 0), 'color': '0070C0'}

task = Task.from_dict({"name": "Research", "time_estimate": 3, "progress": 80})
print(task.name)  # Research
```

---

## In-Memory Output

`generate_excel_bytes()` returns the raw `.xlsx` bytes without writing to disk.
Useful for streaming from a web server or attaching to an e-mail:

```python
chart = GanttChart(sections=sections, ...)

# Flask / Django example
xlsx_bytes = chart.generate_excel_bytes()

response = HttpResponse(
    xlsx_bytes,
    content_type="application/vnd.openxmlformats-officedocument.spreadsheetml.sheet",
)
response["Content-Disposition"] = 'attachment; filename="gantt.xlsx"'
```

---

## Custom Styles

Pass a `GanttStyle` dataclass instance to override any visual property:

```python
from xlsx_gantt import GanttChart, GanttStyle

style = GanttStyle(
    header_bg        = "2C3E50",
    header_fg        = "FFFFFF",
    bar_color        = "E74C3C",
    row_bg_even      = "F2F3F4",
    section_name_bg  = "D5D8DC",
    annotation_r_bg  = "C8FFCC",   # green tint for "R: Responsible"
    annotation_s_bg  = "FFE4B5",   # amber tint for "S: Support"
    col_label_bg     = "FFC000",
    col_label_fg     = "000000",
)

chart = GanttChart(sections=..., style=style, ...)
```

### Key `GanttStyle` fields

| Field | Default | Description |
|-------|---------|-------------|
| `header_bg` | `"7030A0"` | Background for header rows (rows 1–2) |
| `header_fg` | `"FFFFFF"` | Text colour for header rows |
| `bar_color` | `"9966CC"` | Default Gantt bar fill |
| `progress_bar_color` | `"7030A0"` | Solid DataBar fill colour |
| `weekend_bg` | `"EFEFEF"` | Column fill for Sat/Sun |
| `row_bg_even` | `None` | Even data-row background (`None` = white) |
| `row_bg_odd` | `None` | Odd data-row background (`None` = white) |
| `section_name_bg` | `None` | First row of each section |
| `col_label_bg` | `"FFC000"` | Row 3 — Activity / Task / date numbers |
| `annotation_r_bg` | `None` | Background for "R" annotation cells (`annotation_a_bg` still accepted) |
| `annotation_s_bg` | `None` | Background for "S" annotation cells |
| `total_row_bg` | `None` | Total row background (`None` → `header_bg`) |
| `day_names` | `("Mon", …, "Sun")` | Day abbreviations for row 2 (Mon-first) — set your own for other locales |
| `week_label_format` | `"Week {week}"` | Row-1 week band label; `{week}` and `{year}` placeholders |
| `week_start` | `0` | First day of the week band: `0` = Monday … `6` = Sunday. Monday uses ISO week numbers; other days count the week containing 1 January as week 1 |
| `logo_scale` | `1.0` | Logo size as a fraction of the A1:B2 area (the logo fills the header height by default) |
| `font_name` | `"Calibri"` | Font used throughout the sheet |
| `col_width_task` | `25.0` | Task column width (Excel units) |
| `col_width_date` | `3.0` | Width of each day column |

All fields and their defaults are documented in the `GanttStyle` dataclass docstring.

---

## Colour Utilities

The package also exports the colour helpers used internally by the theme engine:

```python
from xlsx_gantt import contrast_text, darken, lighten, rotate_hue

# Pick white or black for maximum WCAG contrast against a background
text = contrast_text("1A5276")   # → "FFFFFF"

# Blend a colour toward black or white
darker  = darken("FFC000", 0.4)
lighter = lighten("FFC000", 0.6)

# Rotate the hue by a given number of degrees (0–360)
comp = rotate_hue("1A5276", 180)
```

---

## For Power Users

- **In-memory output** — `generate_excel_bytes()` returns raw `.xlsx` bytes without touching the file system; drop it straight into a Flask/Django response, e-mail it, or cache it in Redis
- **Theme engine** — `GanttTheme.from_color("#2E86C1")` derives a complete WCAG-contrast-checked palette from any hex colour; the colour helpers `darken`, `lighten`, `rotate_hue`, and `contrast_text` are exported for your own theme logic
- **Typed dataclass API** — `Section`, `Task`, and `DateRange` dataclasses give you IDE auto-completion and type checking; plain dicts still work and can be freely mixed in the same list
- **Multiple bars per row** — paint several independent date ranges on a single task row, each with its own hex colour; any range where `start == end` renders as a milestone
- **Solid progress DataBars** — gradient-free Excel 2010 DataBar conditional formatting, injected via `x14` extension XML post-processing
- **Fine-grained styling** — every colour, font, column width, and row height is a `GanttStyle` field; section names merge vertically, headers freeze, and label columns get auto-filters
- **Locale control** — `GanttStyle.day_names` and `week_label_format` (with `{week}`/`{year}` placeholders) replace the default English labels, and `week_start=6` starts each week band on Sunday
- **Production-safe error handling** — malformed sections, tasks, ranges, and annotations are silently skipped; no unhandled exceptions in live environments

---

# Development

## Development install

```bash
git clone https://github.com/trondegil/xlsx-gantt.git
cd xlsx-gantt
pip install -e ".[dev]"
```

## Project Structure

```
xlsx-gantt/
├── xlsx_gantt/                # Library package
│   ├── __init__.py            # Public re-exports
│   ├── style.py               # GanttStyle configuration dataclass
│   ├── models.py              # Section, Task, DateRange input dataclasses
│   ├── chart.py               # GanttChart builder
│   ├── themes.py              # GanttTheme + colour utilities
│   ├── cli.py                 # xlsx-gantt command-line interface
│   ├── py.typed               # PEP 561 marker
│   └── _xlsx_patch.py         # Internal: solid DataBar XML post-processor
├── examples/
│   ├── bakery-logo.png        # Logo used in the README example
│   ├── bakery-plan.json       # AI-written plan from the README
│   └── bakery-plan.xlsx       # The workbook built from it
├── tests/
│   ├── __init__.py
│   ├── test_malformed_input.py
│   ├── test_new_features.py
│   ├── test_readme_example.py
│   ├── test_cli_color.py
│   ├── test_examples.py
│   ├── test_v020.py
│   └── test_week_start.py
├── pyproject.toml
├── requirements.txt
├── requirements-dev.txt
├── CHANGELOG.md
├── LICENSE
└── README.md
```

## Running the Tests

```bash
pip install -r requirements-dev.txt
pytest
```

The test suite covers:
- Valid input (dict API and dataclass API)
- In-memory output (`generate_excel_bytes`)
- Mixed dict + dataclass inputs
- `to_dict` / `from_dict` round-trips
- `patch_solid_databars` with both file paths and `BytesIO`
- Malformed sections, tasks, ranges, and annotations
- Edge-case chart configurations (empty date ranges, `None` fields, reversed dates, etc.)
- The CLI and its options (`--theme`, `--color`, `--logo`, `--week-start`)
- Week numbering for every week start, including weeks that span New Year
- Every plan in `examples/`

---

## Requirements

| Package | Version | Notes |
|---------|---------|-------|
| Python | ≥ 3.10 | |
| [openpyxl](https://pypi.org/project/openpyxl/) | ≥ 3.1.0 | Required |
| [Pillow](https://pypi.org/project/Pillow/) | ≥ 10.0.0 | Required |

---

## Contributing

Contributions are welcome! Here is the recommended workflow:

1. **Fork** the repository and create a feature branch:

   ```bash
   git checkout -b feature/my-improvement
   ```

2. **Install** the project in editable mode with dev dependencies:

   ```bash
   pip install -e ".[dev]"
   ```

3. **Make your changes.** Keep the following guidelines in mind:
   - Follow the existing code style (PEP 8, type hints, docstrings).
   - Add or update tests in `tests/` for any changed behaviour.
   - All colour values must be 6-digit hex strings without a leading `#`.

4. **Run the test suite** and make sure all tests pass:

   ```bash
   pytest
   ```

5. **Commit** with a clear, descriptive message:

   ```bash
   git commit -m "feat: add X / fix Y"
   ```

6. **Open a pull request** against the `master` branch describing what you changed and why.

### Reporting issues

Please open a GitHub Issue and include:
- Python version (`python --version`)
- openpyxl version (`pip show openpyxl`)
- A minimal reproducible example or the full traceback.

---

## License

This project is licensed under the **MIT License** — see the [LICENSE](https://github.com/trondegil/xlsx-gantt/blob/master/LICENSE) file for the full text.

> **Dependency licences**
> - [openpyxl](https://pypi.org/project/openpyxl/) — MIT
> - [Pillow](https://pypi.org/project/Pillow/) — HPND (historically permissive, MIT-compatible)