← Dashboard Alt layout A View current layout → Multiple runs →
⚠ Xe-135 alert +10% above DT prediction — SRO notified. Acknowledge before continuing normal ops.
Operator on duty
K. Lee
SRO · Shift 08:00–16:00 · Session 2h 14m
Active

Run #5401

Experimenter
Adrian Nakamura
Yb/Lu · RSR · Ops #2026-07
Beam Port Kiosk: Connected

Irradiation in Progress

Linked from Ops Log ✓
Yb/Lu activation — RSR
Target window: 90–120 min @ 100 kW
Elapsed
62 min
Inserted 08:12:00
Schedule
62%
On track ✓
Remaining
~38–58m
Est. removal 09:42–10:12
Progress 62% complete
0 Target 90–120 min 120
Inserted: 08:12:00 · Est. Removal: 09:42–10:12

Reactor Power

100.2 kW
Setpoint: 100 kW ± 1%
Δ +0.2% ✓

Thermal Flux — RSR

1.84×10¹³
Normal: 1.8–2.2×10¹³ n/cm²·s
Δ −8.7%

Position Temperature

41.2 °C
Normal: 25–45 °C
Δ +2.0% ✓

Beam Port / Comms

Kiosk Connected — Adrian Nakamura GO 08:05:22
Awaiting experimenter acknowledgment
✓ Adrian Nakamura confirmed — Sample submitted 08:12:00