Measurements
Every recorded check against its specification limits. A point outside the band is a failure, and each one opened the non-conformance listed below — the link is the audit trail, not an inference.
Specifications —
| Material | Characteristic | Min | Max | Unit |
|---|
Non-conformances —
Raised automatically when a measurement falls outside spec. Closing one is a supervisor action and is recorded against them.
Inspection history —
| When | Material | Characteristic | Measured | Result | Inspector |
|---|