TYPES
warehouse: Source(Iron);
conveyor: Bus(Iron);
pipe: Bus(Coin);
machine: Converter(Iron, Coin);
bay: Sink(Coin);
gate: Switch;


COMPONENTS

central warehouse:  1;
main conveyor:      2;
secondary conveyor: 2;
main machine:       2;
main pipe:          2;
secondary pipe:     1;
output bay:         2;

gate: *;


ABBREVIATIONS
central warehouse 1:    CW;
main conveyor 1:        MC1;
main conveyor 2:        MC2;
secondary conveyor 1:   SC1;
secondary conveyor 2:   SC2;
main machine 1:         M1;
main machine 2:         M2;
main pipe 1:            MP1;
main pipe 2:            MP2;
output bay 1:           B1;
output bay 2:           B2;


CONNECTIONS

CW -(gate 1)> MC1;
CW -(gate 2)> MC2;
CW -(gate 3)> SC1;
CW -(gate 4)> SC2;

MC1 -(gate 5)> M1;
MC2 -(gate 6)> M2;
SC1 -(gate 7)> M1;
SC2 -(gate 8)> M2;

M1 -(gate 9)> MP1;
M2 -(gate 10)> MP2;

UNSWITCHED
MP1 -> B1;
MP2 -> B2;

REQUIREMENTS
never-connect(conveyor, conveyor, central warehouse);
never-connect(conveyor, conveyor, main machine);
never-connect(machine, machine, pipe);

must-disconnect-failed(main conveyor, 20, MS);

never-disconnect(output bay 1, warehouse, 30, MS);
never-disconnect(output bay 2, warehouse, 30, MS);

ASSUMPTIONS
no-failures(central warehouse);
no-failures(secondary conveyor);
no-failures(main machine);
no-failures(main pipe);
no-failures(secondary pipe);
no-failures(output bay);
no-control(central warehouse);
no-control(main conveyor);
no-control(secondary conveyor);
no-control(main machine);
no-control(main pipe);
no-control(secondary pipe);
no-control(output bay);

switch-on-time(gate, 10, MS);
switch-off-time(gate, 10, MS);

max-failures(main conveyor, 2);