Irradiation in Progress
Linked from Ops Log ✓
Yb/Lu activation — RSR
Target window: 90–120 min @ 100 kW
Elapsed
62 min
Inserted 08:12:00
Schedule
62%
On track ✓
Remaining
~38–58m
Est. removal 09:42–10:12
Inserted: 08:12:00 · Est. Removal: 09:42–10:12
Reactor Power
100.2 kW
Setpoint: 100 kW ± 1%
Δ +0.2% ✓
Thermal Flux — RSR
1.84×10¹³
Normal: 1.8–2.2×10¹³ n/cm²·s
Δ −8.7%
Position Temperature
41.2 °C
Normal: 25–45 °C
Δ +2.0% ✓
Beam Port / Comms
Kiosk Connected — Adrian Nakamura
GO 08:05:22
Awaiting experimenter acknowledgment
✓ Adrian Nakamura confirmed — Sample submitted 08:12:00