Problems the system ran into, the decisions they led to, and whether each problem came back after the change. Problems are grouped from friction, correction and failed-worker entries in the work log; decisions are the operator's recorded rulings and consents, normalized and cleaned.
The twelve problems that cost the most time, each at the first stage the record cannot show. Time is the total length of its incidents.
Each problem sits on the path problem, decision, fix built, fix in use, measured result. The bar shows how many stop at each stage; the number is the count.
The same problems and decisions drawn as a network. Optional: it is easiest to read by zooming and clicking. The ten largest items are labelled.
Recurring habits in how the operator's decisions are made.